In the early 1990's a Canadian couple followed their dream and
purchased an onion field. They set to work planting palms and other
plants, building a swimming pool, and some small, simple houses
which were to be rented.
After three years of renting at he property, hours and hours of
introspection and analysis of what was important to him and to others
at his stage in Life, he was offered the property in December 2001.
His research of other developments in Costa Rica convinced him that
many of the features valued by North Americans / Europeans were
largely missing from other developments in CR. If he wanted it,
he would have to build it. Focus group discussions in Canada, countless
additional informal discussions, were followed by interviews of
over 35 architects during a 6 month period. Numerous site plan iterations,
and countless design refinements later, Residencias Los Jardines
was created.
Phase 1
Beginning in April 2002, the mechanical services and telecommunications
systems were upgraded. This was followed by the renovation and in
some cases the enlargement of the original houses. Not that there
had been any problems but a perimeter security fence was installed.
The original swimming pool and lounge area was completely remade
by tiling the pool, adding a water falls, extending the lounging
area around the pool, adding 5 palm thatched ranchos (palapas),
night lighting, and landscaping.
Phase 2
On Nov. 15, 2003 , ground was broken for the development of 5 new
houses. In addition, a second swimming pool with another three palm
thatched ranchos (palapas) were added, another thousand plus plants
added including the creation of an orchid and bromide garden, an
property management and telecommunications center as well as additional
telecommunications and electrical / mechanical infrastructure were
added. This work was completed in May, 2004.
Following the completion of Phase 2, the lease-up of
the new units followed. In addition, all legal
documentation for the subsequent sale of the units was
completed, title insurance secured, a web site was
created, and the beginnings of additional marketing
material was created (brochures and a DVD).
Phase 3
The final phase of construction began November 2004.
An additional 14 houses were built and the existing 8
houses were torn down and rebuilt. The front entrance
was built, the municipal roadway and internal roadways
paved, and support facilities and buildings were
added. State of the art telecommunications systems
were installed --VOIP capability, DISH TV network,
Cable TV, hardwired as well as wireless high speed
internet. The property management company began
managing the property in May 2006; the final
construction is expected to be completed by the end of
July 2006.
House Sales: Most of the houses were sold during this
phase. As of June 1, only four houses remain - two
that have long term leases; two which are available
for sale and ready for occupancy.
Rental vacancies occur periodically.
To follow our progress click here.
Contact
us at any time to purchase a new house and still be able to
select your finishings. |